This post chronicles the work done on the Lilypond at the bottom of the Italian walk.

2008 – Work starts to remove old crumbling concrete sloping edge.

 

Before work starts on lily pond 2008
 2008 – Before work starts to repair the edge.

The first task was to dig a trench so that the lilypond doesn’t overflow as a result of heavy rainfall.

 

Dig trench for the overflow soakaway
Dig a trench to install a soakaway to prevent overflow.

Next, level off the old edge of the pond by keying in the sound edge and then making some wooden shuttering (missing in picture) so that we could pour in the concrete mix. Then top off with an inch of mortar to level off.

 

Begin levelling off
Level the old sloping edge

 

 

casting edge
Install new stone sections and apply mortar joint

 

DSC_0046
Stonework now Complete

 

Pointing finished
Garden bed ready for planting

 

 

 

 

 

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s